Input from Engineers for Feature Freeze

Feature Owner Will you be able to complete your features by Oct 31, 2006? If not, when will it be done?
In Memory Replication Larry White  
WSIT Integration Vijay Ramachandran Integration of JAXWS2.1 based WSIT stack along with corresponding 109 implementation will be completed by 10/31. Not sure if JAXWS2.0 can be completely removed from GFv2 by this date. Cannot address 109 and JAX* related CTS issues by this date. Will need at least two more weeks
JSR 196 Shing Wai Chan Since the spec has not been finalized yet and SOAP profile implementation depends on WSIT integration, we would need at least one or two weeks more.
JBI Integration Binod PG, Keith Babo  
GMS Sreedhar Ganapathy GMS Code will be ready for checkin within a week and a half. Possible delays could occur if the legal review for bundling JXTA jar with Appserver gets delayed.
Profile Support Kedar Mhaswade Basic infrastructure should be ready. However, since I am working on a schedule with vacation, I'd like to have two weeks to stabilize the code. Projected date: 11/10/2006.  
Admin CLI Jane Young New features will be completed.  
Admin GUI Anissa Lam PE features in Admin GUI JSF version will be done except the following: Log viewer, monitoring statistics, Common Task page, graphs . Will push this JSF version as the default GUI. EE features (except LB related, HADB) will be available by MS3 completion (12/11).  
CORBA/Grizzly v2 integration Ken Cavanaugh Projected completion date is 11/20  
CORBA performance optimization Ken Cavanaugh Can complete current plan by 10/31, but further work may be required through November  
AS/MQ integration Sivakumar Thyagarajan All features from the AS side to implement the features listed in the one pager would be completed. Currently MQ plans for delivering HA-Cluster for our MS3 are being revisited. DIRECT support from MQ is planned only after beta  
Installer Snjezana Sevo-Zenzerovic Estimated feature completion date 11/15 (this date is mainly driven by dependencies such as profiles support implementation).  
Update Center Snjezana Sevo-Zenzerovic Estimated feature completion date 11/15